Flow Chart of 500th Stone Crushing Plant: Process Design, Equipment Configuration, and Real-World Performance
A 500th (500 tonnes per hour) stone crushing plant is a mid-to-large scale aggregate production system typically configured as a three-stage closed-circuit process: primary crushing (jaw crusher), secondary crushing (cone or impact crusher), and tertiary crushing/screening (vertical shaft impactor or fine cone crusher with vibrating screens). The flow chart begins at the raw material hopper, passes through vibrating feeders into the primary crusher, discharges onto belt conveyors feeding the secondary crusher, then to the screening deck where oversize material recirculates to the tertiary crusher while finished aggregates are separated into 0–5 mm, 5–10 mm, 10–20 mm, and 20–31.5 mm stockpiles. Dust suppression units, magnetic separators, and centralized PLC control are integrated at each transfer point. The configuration below reflects standard engineering practice for limestone, granite, and basalt feed material with a feed size of ≤600 mm and a target product size of ≤31.5 mm.
Typical Equipment Configuration for a 500 t/h Plant
| Stage | Equipment | Model Example | Key Parameters | Function |
|---|---|---|---|---|
| Feeding | Vibrating feeder | ZSW-490×110 | 500–600 t/h, max feed 630 mm | Uniform feeding, pre-screening of fines |
| Primary crushing | Jaw crusher | PE-900×1200 | Feed opening 900×1200 mm, CSS 100–200 mm | Reduce run-of-mine to ≤250 mm |
| Secondary crushing | Cone crusher (standard) | CS/HP 300 | 300–500 t/h, CSS 25–50 mm | Reduce to ≤80 mm |
| Tertiary crushing | Cone crusher (short head) or VSI | HP 200 / VSI-1140 | 200–350 t/h | Shape correction, reduce to ≤31.5 mm |
| Screening | Inclined vibrating screen | 3YK-2460 (3-deck) | 500–600 t/h, 3 decks | Split into 4 product sizes |
| Conveying | Belt conveyors | B800–B1000 | 500–600 t/h | Material transport between stages |
| Dust control | Pulse-jet bag filter + water spray | — | — | Compliance with emission limits |
Process Flow Description
- Feed and pre-screening. Raw material is dumped into the hopper and conveyed by the ZSW vibrating feeder, which scalps material below 100 mm directly to the secondary stage, bypassing the jaw crusher and reducing its load by 15–25%.
- Primary crushing. Material above 100 mm enters the PE-900×1200 jaw crusher, discharging at approximately 150–250 mm.
- Secondary crushing. The primary product and scalped fines join on the main belt and enter the standard cone crusher, producing ≤80 mm material.
- Screening and recirculation. The secondary product reports to the 3-deck screen. Oversize (>31.5 mm) returns to the tertiary crusher; the closed-circuit recirculating load typically runs 30–50%.
- Tertiary crushing and final classification. Short-head cone or VSI output is re-screened, and finished products are stockpiled by belt stackers.
- Auxiliary systems. Magnetic separators remove tramp iron before secondary and tertiary crushers; bag filters at transfer points keep dust below 20 mg/m³.
Real-World Case: 500 t/h Granite Plant, Shandong Province, China
A granite quarry in Shandong commissioned a 500 t/h three-stage plant in 2021 with the configuration above (PE-900×1200 jaw + HP300 standard cone + HP200 short-head cone + 3YK-2460 screen). Measured results after commissioning:
- Actual throughput: 520 t/h at 85% availability;
- Product gradation: 0–5 mm (28%), 5–10 mm (22%), 10–20 mm (30%), 20–31.5 mm (18%), with <2% oversize;
- Needle-flake content in 10–20 mm product: 8.5%, within the ≤10% requirement of GB/T 14685 for Class II aggregate;
- Specific power consumption: 1.35 kWh/t, about 12% lower than the client's previous two-stage plant because of the pre-screening bypass;
- Dust emission at stack: 18 mg/m³, meeting the local 20 mg/m³ limit.
The operator reported that the main bottleneck during ramp-up was the recirculating load on the tertiary circuit, resolved by widening the tertiary CSS from 12 mm to 16 mm and adding a second deck panel, which raised availability from 72% to 85% within three months..jpg)
FAQ
Q1: What feed size can a 500 t/h plant accept?
With a PE-900×1200 primary jaw, the maximum feed size is 750 mm (theoretical) but practical operation limits it to about 600 mm to protect the crusher and maintain throughput. Larger feed requires a bigger jaw (e.g., PE-1000×1200) or hydraulic breaker pre-reduction.
Q2: Jaw + cone versus jaw + impact—which suits a 500 t/h plant?
For abrasive rock such as granite and basalt, jaw + cone is standard because impact blow bars wear rapidly (typically 40–60% higher wear cost per tonne). For limestone with low silica content, a jaw + impact (or impact-only) circuit is viable and produces better particle shape at lower capital cost, but operating cost per tonne is higher on abrasive feeds.
Q3: Why is a closed circuit used instead of open circuit?
A closed circuit with a tertiary crusher and recirculating screen keeps oversize out of the product and stabilizes gradation. In the Shandong case, open-circuit operation would have produced roughly 8–12% oversize in the 10–20 mm fraction, failing the specification. The trade-off is a 30–50% recirculating load and higher screening capacity requirements..jpg)
Q4: What is the typical power installed for a 500 t/h plant?
Approximately 550–650 kW total: jaw crusher 110–132 kW, secondary cone 220–250 kW, tertiary cone 160–200 kW, screens 45–60 kW, feeders and conveyors 60–80 kW. Specific consumption of 1.2–1.5 kWh/t is typical for hard rock in a well-designed three-stage circuit.
Q5: How much water and dust control is needed?
Water spray consumption is typically 0.5–1.0 m³/h per transfer point, plus bag filters on the crusher discharge and screen enclosures. The Shandong plant uses 6 spray points and 4 bag filter units, consuming about 4 m³/h of water in dry weather—well below the local allocation, because most dust is captured at enclosed transfer points rather than suppressed by wetting.