1.Machine hoisting1.Machine hoisting
It can be hoisted and transported as a whole, reducing the dismantling time and installation time.
2.Reduce civil works2.Reduce civil works
The loading height of the coarse crushing truck is reduced, and the overall design of the loading bin is made to reduce the customer's investment in civil engineering and loading walls. On-site foundation-free or simple foundation installation.
3.Save area3.Save area
Reduce the area occupied by the overall production line and save customer site investment.
4.Intelligent control4.Intelligent control
Integrated control of a single crushing station, optional centralized control of the production line, to achieve integrated control of the entire production line.
5.Convenient and flexible5.Convenient and flexible
The configuration of the production line can be adjusted at any time (increase or decrease, or even replace equipment) according to changes in on-site working conditions.
6.Various combinations6.Various combinations
The multi-style method can realize the separation of the crushing unit and the screening unit, which is convenient to realize the overall sealing and meet the environmental protection requirements.